SM-3
Standard Missile 3 (Block IB / IIA)
Ship-launched interceptor that hits ballistic missiles in space. At about $30M each it's the most expensive missile here, and the slowest to build.
Launched from: Aegis destroyers and cruisers · ~$30M each
39–68% of ~410 before the war · as of Nov 3, 2026 · 25 days old
At the opening campaign's pace (~5/day) that's 33–57 days of fire with no resupply.
Where the estimates land
Every stock-left figure a source gives for the SM-3, on one timeline. Sources disagree, and the gap between them is part of the story. Converted figures (dashed) turn a reported share used into a count using a prewar total the source didn't give, so treat them as rougher than the rest.
In blocks of 10
left within the estimate's range used since Feb 28
Rebuild model
How fast does the stockpile come back? This projects it forward from the deliveries already in the pipeline and the FY2027 rebuild order, using the budget's own schedules. Move the sliders to test faster production or a renewed war.
Starts from the newest estimate (Nov 3, 2026) and assumes no firing after it unless you set "Firing since the estimate" or add a renewed war. Firing after the estimate date isn't counted, so a projection from an older estimate is optimistic. The sliders are saved in the page's address, so you can share a scenario as a link. The default firing rate is the opening campaign's average: ~5 a day over 39 days.
Table view
| Date | Low estimate | High estimate |
|---|
Every estimate
| As of | Claim | Source | Type |
|---|---|---|---|
| Nov 3, 2026 | 130–250 usedQuote“SM-3 $30 million 410 130–250 Mid-2029” Table 2 row: unit cost, prewar inventory estimate, Iran war use estimate, estimated recovery to prewar level. CSIS dates the table November 3, 2026. | CSIS Nov 10, 2026 | Estimate |
| Jul 31, 2026 | StatementQuote“about one-third of the initial inventory for the rest (JASSM, SM-2/3/6, and Tomahawk)” | CSIS Jul 31, 2026 | Estimate |
| May 27, 2026 | Statement Per CNN, citing DoD sources Quote“A CNN report citing DOD sources indicated that actual Standard Missile usage in Operation Epic Fury was closer to the lower-bound estimates in the CSIS munitions inventory study” | CSIS May 27, 2026 | Reported |
| Apr 8, 2026 | 130–250 usedQuote“SM-3 $28.7 410 130–250 64” Table 1 row. The range reflects uncertainty over allied intercepts and munitions mix. | CSIS Apr 21, 2026 | Estimate |
| Feb 28, 2026 | ~410 before the warQuote“SM-3 $30 million 410 130–250 Mid-2029” Table 2 row: unit cost, prewar inventory estimate, Iran war use estimate, estimated recovery to prewar level. CSIS dates the table November 3, 2026. | CSIS Nov 10, 2026 | Estimate |
| Feb 28, 2026 | ~410 before the warQuote“SM-3 $28.7 410 130–250 64” Table 1 row. | CSIS Apr 21, 2026 | Estimate |
Model inputs
| Input | Value | Source |
|---|---|---|
| Unit cost Table 2: FY2027 budget unit cost, rounded to the nearest $100,000. | $30M | CSIS, Nov 10, 2026Quote“SM-3 $30 million 410 130–250 Mid-2029” |
| U.S. deliveries per year (recent average) Table 2: 40/yr Block IB plus 13/yr Block IIA ("SM-3 IIA 13 57 7 64"). | 53 | CSIS, Apr 21, 2026Quote“SM-3 IB 40 42 10 52” |
| FY2027 budget request 78 Block IB + 136 Block IIA. | 214 | CSIS, May 27, 2026Quote“78 SM-3 Block IBs, 136 SM-3 Block IIAs, and 540 SM-6s” |
| FY2027 deliveries begin Assumes appropriations in October 2026, plus 37 months. | Nov 2029 | CSIS, May 27, 2026Quote“These orders will take between 36 and 39 months to begin deliveries once Congress provides appropriations.” |
| Months to deliver a full lot Table 2: production time for a full Block IB lot. | 10 | CSIS, Apr 21, 2026Quote“SM-3 IB 40 42 10 52” |
| CSIS rebuild outlook Table 2: estimated recovery to prewar inventory, as of November 3, 2026. | Mid-2029 | CSIS, Nov 10, 2026Quote“SM-3 $30 million 410 130–250 Mid-2029” |
